News

MTCC completes 75% work on harbor basin dredging for Muraidhoo Harbor Project

Maldives Transport and Contracting Company (MTCC) has revealed that the new harbor basin dredging operation is progressing with 75% completion, for Ha. Muraidhoo Harbor Development Project.

The scope of the project includes, construction of a 212m quay wall, a 407m breakwater, a 107m repair work of breakwater, a 105m revetment, a 50m groyne, dredging operations of harbor and channel, construction of a ramp, a walkway bridge, installation of navigation lights and harbor lights.

The value of the project is MVR 33.7 million.