Maldives Transport and Contracting Company (MTCC) has completed R. Kinolhas Harbour Development Project.

Scope of work for the project included new harbour basin dredging operations of 31,726 cbm, existing harbour basin dredging operations of 15,252 cbm, channel dredging operations of 1,920 cbm, boat beaching dredging operations of 6,100 cbm, construction of a 186m quay wall, a 172.30m rectification of existing quay wall, a 285m breakwater, a 65m revetment, a 130m groyne, installation of 1884 sqm harbor pavement, installation of beacons and mooring blocks, construction of a jetty, and a concrete ramp.

The project is valued at MVR 46.55 million.